Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow

NM 14 - Roadway Construction

3/20/2018

The New Mexico Department of Transportation is planning several improvements on NM 14 over the next several years. Pavement Rehabilitation will be done in three phases:

Phase 1: Milepost 0 to 2, Construction Spring/Summer 2018

Phase 2: Milepost 2 to 4, Construction Spring/Summer 2019

Phase 3: Milepost 4 to 6, TBD

Phase 1: Repaving will start on April 2 through mid August (Monday - Friday) - one lane will be open in each direction at all times.

NMDOT: (505) 798-6750

Upcoming Event

Sandia Peak Ski Season

January 5, 2019
Sandia Peak Ski Season opens January 5, 2019.
Event details »
View all events »

NM Vacation Guide

Donate or Pay Dues

Donate or pay annual membership dues

PayPal