Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow Turquoise Trail Drive Slideshow

NM 14 - Roadway Construction

3/20/2018

The New Mexico Department of Transportation is planning several improvements on NM 14 over the next several years. Pavement Rehabilitation will be done in three phases:

Phase 1: Milepost 1 to 2 Done
Phase 2: Milepost 2 to 4, Funding programmed in 2018 and 2019, Anticipated Construction Spring/Summer 2019
Phase 3: Milepost 4 to 6, TBD

Slope Stabilization for slope on east side on NM 14 between milepost 3.5 and 4.2. TBD
Intersection Evaluation of NM 14 / NM 536 / Frost Rd intersection and development of alternatives for reconstruction. TBD

NMDOT: (505) 798-6750

Upcoming Event

Cerrillos History Hike

July 27, 2019
History presentation and easy hike through the town of Cerrillos.
Event details »
View all events »

NM Vacation Guide

Donate or Pay Dues

Donate or pay annual membership dues

PayPal